Before / During / After Pix of the 1971 Globetrotter:
Front Gaucho Before
after removing everything and painting the bulkhead white (notice yellowing plastic in above picture) :
Removal 'Pile'
After removing light fixtures & cleaning, priming, painting
After cleaning, priming, removing screens, and then painting the vinyl a tan color:
After installing the floor, painting the trim brown, shelving installed, screens painted, and screens re-installed:
After scrubbing the bronze to nickel color, painting the gaucho a dark brown, and re-installing the gaucho frame over the new vinyl bamboo floor:
Finished Product: new upholstery, new curtains, new shelves by instrument panel, stained shelving, painted bulkhead white, painted vinyl tan, floor install, gaucho install....
Side Gaucho & Bulkhead:
Before
After removing everything (floor was in good shape, plumbing was working, and furnace was good too)
After installing the floor and re-installing painted trim on screens - walls painted tan (after cleaning/priming)
Gaucho re-installed after floor was installed - Gaucho was painted dark brown and metal was scrubbed to remove bronze color and match the nickel color. Aluminum sheets were used to cover the existing walls to closet and wall separating bathroom:
Curtain rods and curtains re-installed:
Side gaucho finished with re-upholstered cushions.
Fridge and Stove Before:
Fridge and Stove After
Kitchen:
Before:
During - everything removed
Kitchen after cabinetry installed, stained, painted - new 2 burner gas top with a 3 way fridge (Propane, 12V, & docked), new sink, new floor, painted walls, ceilings, new lights, new alum walls.
Bathroom Sink Before/After (stainless steal top, cabinets painted dark brown and vinyl wall painted tan
Toliet Before:
Looking to the rear Before - old walls separating kitchen/living area from bathroom/closets
After:
More Pix of 'After'
Looking towards the rear:
Looking towards the front:
Kitchen Sink:
new over-head lights:
new reading lights detail: